← Back to projects

CASE STUDY / SELF-INITIATED CONCEPT

Less managing work.
More doing it.

Clearspace explores a quieter workspace for independent people and small teams: one clear overview, a short plan for today, and a visible sense of progress.

Fictional case study. The brief and project history are illustrative. No client engagement, research findings, or business results are claimed.

MY ROLE
Product direction, interface design & front-end concept
TIMEFRAME
A six-week concept brief
DELIVERABLE
Interface concept & documented decisions
Task management app overview
PROJECT 01 / INTERFACE OVERVIEW

01 / PROJECT NOTES

The brief.

A useful workspace should make the next step easier to see. The starting assumption is that when every task receives the same visual weight, people have to prioritize the list again every time they open it.

The brief was to design a smaller alternative: show the current focus, keep today’s plan short, and make completion clear. Work outside that plan should stay available without competing for attention.

The boundary

The concept covers planning, task states, and visual hierarchy. Accounts, permissions, notifications, and a production database need a separate specification.

02 / PROJECT NOTES

My approach.

For this sample engagement, the role combines product thinking and interface engineering. I translated the brief into three everyday moments and used them to decide what belonged on the first screen.

  1. 01 — Start the day.

    See the current project and its next small steps before opening a longer list.

  2. 02 — Do the work.

    Move to a focused task view using the same labels and completion language.

  3. 03 — Close the loop.

    Make completed work explicit and keep progress easy to understand.

03 / PROJECT NOTES

The interface.

The overview gives one project priority. A short description explains why it is here; a small progress indicator shows completion without turning the workspace into an analytics dashboard.

The companion task view removes the focus card. The same task names and completion states remain, so the view change feels like a change of emphasis.

Clearspace focused task view
Project concept: the same tasks in a focused view.
Open the interactive concept ↗

04 / PROJECT NOTES

Design system.

Quiet surfaces separate groups without giving every block a heavy border. A restrained green accent belongs to the Clearspace product concept; labels and checkmarks communicate state alongside color.

A small set of repeatable spacing steps connects titles, supporting text, and task controls. Task names can wrap on narrow screens without losing their relationship to their completion state.

One primary focus

Make the next action easier to identify. Tradeoff: less information on the first screen.

Two connected views

Support planning and doing separately. Tradeoff: a second view to maintain.

A small component vocabulary

Keep the experience consistent. Tradeoff: fewer special layouts for individual features.

05 / PROJECT NOTES

The outcome.

The result is a focused interface direction with a coherent overview, task list, and completion language. The accompanying concept lets you switch views and mark tasks complete; state remains local to this demonstration.

The case study connects those interface choices to the brief. It does not claim increased retention, productivity, production adoption, or a completed client engagement.

What I would validate next

Ask independent workers to identify today’s priority, locate a task, and explain its completion state without a walkthrough. Check whether the hierarchy is obvious, the views feel connected, and the reduced overview leaves out anything essential.

Only after that would I specify a production pilot, persistence, permissions, and measurable success criteria.

← Back to selected projects